Modu Magazine: A Tale of Urban China

A Chinese construction company completes construction of 30-story building in 15 days

According to Archdaily, the construction of a 30-story building in central China has been achieved… in 15 days. Entirely designed with prefabricated rooms – with a construction time of a little more than 15 days, a factor not taken into account into total construction time – this video, relayed through different media (Archdaily, Inhabitat, etc.), nevertheless traces the installation of a building whose structure can be built and dismantled easily.

It is like some sort of Lego construction: all pre-built rooms, worked and modeled in advance, come together perfectly to give birth to a building with a limited shelf-life. The spreading of this video was a great piece of PR for the manufacturer, Broad Group.

  • 2012/02/07

    calendar
  • Yueyang

    calendar
  • Modu Team

    calendar
tags
list_balck
icon_of_section

the other map

explore arrow_links arrow

loading map - please wait...

Yuening completes construction of 30-story building in 15 days 29.364433, 113.115921 YUENING COMPLETES CONSTRUCTION OF 30-STORY BUILDING IN 15 DAYSTags: Architecture, Urban Imaginaries